SCH Number 2018091026


Project Info

Title
Mt. San Antonio College Transit Center
Description
The proposed project is divided into four project elements. The first element, a new transit center, involves the construction of a ten-bus bay transit center. The bus bays would be located around a central bus plaza and would accommodate pedestrian loading and unloading. Construction of the transit center would include other improvements including improvements to vehicular and non-vehicular circulation; landscape, hardscape, fencing, and lighting; and utility infrastructure. The second element, proposes improvements to Temple Ave including a traffic signal at the existing driveway on Temple Avenue. As part of the third element, the existing vehicular access southeast of Technology Center (Building 28A/B) and between the driveway from Lot D-2 and D-3 would be modified to prohibit vehicular movement. This would involve repaving and adding a series of bollards to restrict through vehicular movement. The last project element would expand the driveway and pedestrian circulation area at the existing driveway that connects the surface parking area to the Exercise Science/Wellness Center (Building 27A). Pool, Pool Building (Building 27B) and Physical Education Center (building 27C) to Modulars 18A through 18D.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Mt. San Antonio Community College Mt. San Antonio College Transit Center
Mt. San Antonio Community College Mt. San Antonio College Transit Center