SCH Number 2018079020


Project Info

Title
Operation of Rancho California Water District - Disinfection Improvements at the Ace Bowen and Senga Doherty Pump Stations Project (Project)
Description
Site 1: The District will construct 3 chloramination chemical injections stations, (each including a static mixer, water sampling probe in a vault, and associated piping). The District will also construct a disinfection building and install 2 sodium hypochlorite metering pumps, 2 aqua ammonia metering pumps, an aqua ammonia storage tank, an ammonia scrubber, 3 chlorine analyzers, 3 chloramine analyzers, and a sodium hypochlorite generation system with water supply chiller. Concrete tank foundations with a metal sunshade will also be installed to shelter a sodium hypochlorite tank, salt brine maker, and a relocated standby generator. Site 2: The District installed a chloramination chemical injection station, including a static mixer and piping. The District also constructed at a disinfection building and installed 2 sodium hypochlorite metering pumps, 2 aqua ammonia metering pumps, a sodium hypochlorite tank and brine makeup tank, an aqua ammonia storage tank, an ammonia scrubber, a chlorine analyzer, a chloramine analyzer, and a sodium hypochlorite generation system with water supply chiller. A concrete foundation with metal sunshade was also installed to shelter a sodium hypochlorite tank, a salt brine maker, and outdoor air conditioning unit. An existing chlorine shed was removed from the site. The project will provide for the operation of the system.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
State Water Resources Control Board Operation of Rancho California Water District - Disinfection Improvements at the Ace Bowen and Senga Doherty Pump Stations Project (Project)
State Water Resources Control Board Operation of Rancho California Water District - Disinfection Improvements at the Ace Bowen and Senga Doherty Pump Stations Project (Project)