Operation of Rancho California Water District - Disinfection Improvements at the Ace Bowen and Senga Doherty Pump Stations Project (Project)
Summary
- SCH Number
- 2018079020
- Lead Agency
- State Water Resources Control Board
- Document Title
- Operation of Rancho California Water District - Disinfection Improvements at the Ace Bowen and Senga Doherty Pump Stations Project (Project)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 2/25/2019
- Document Description
- Site 1: The District will construct 3 chloramination chemical injections stations, (each including a static mixer, water sampling probe in a vault, and associated piping). The District will also construct a disinfection building and install 2 sodium hypochlorite metering pumps, 2 aqua ammonia metering pumps, an aqua ammonia storage tank, an ammonia scrubber, 3 chlorine analyzers, 3 chloramine analyzers, and a sodium hypochlorite generation system with water supply chiller. Concrete tank foundations with a metal sunshade will also be installed to shelter a sodium hypochlorite tank, salt brine maker, and a relocated standby generator. Site 2: The District installed a chloramination chemical injection station, including a static mixer and piping. The District also constructed at a disinfection building and installed 2 sodium hypochlorite metering pumps, 2 aqua ammonia metering pumps, a sodium hypochlorite tank and brine makeup tank, an aqua ammonia storage tank, an ammonia scrubber, a chlorine analyzer, a chloramine analyzer, and a sodium hypochlorite generation system with water supply chiller. A concrete foundation with metal sunshade was also installed to shelter a sodium hypochlorite tank, a salt brine maker, and outdoor air conditioning unit. An existing chlorine shed was removed from the site. The project will provide for the operation of the system.
- Contact Information
-
J Steven Williams
State Water Resources Control Board
Lead/Public Agency
1350 Front Street, Room 2050
San Diego, CA 921001
Phone : (619) 525-4159
Location
- Cities
- Murrieta Temecula
- Counties
- Riverside
- Other Location Info
- Ace Bowen Pump Station Site.
Notice of Determination
- Approving Agency
- SWRCB
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 1350 Front Street, Room 2050, SD, CA 92101
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Attachments
- Notice of Determination
- 2018079020 PDF 372 K
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.