SCH Number 2018061068


Project Info

Title
Cactus II Feeder Transmission Pipeline Project
Description
The proposed project involves the construction and operation of approx five miles of water transmission pipeline ranging from 30 in to 42 in in diameter. The proposed project would also include four turnouts to interconnect pumping lanes, a 30-in lateral pipeline along Nason St from Alessandro Blvd to Cottonwood Ave to connect to the Letterman Booster Pumping Station, and construction of transmission pipelines along Perris Blvd to connect to Turnout 2.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Eastern Municipal Water District (EMWD) Cactus II Feeder Transmission Pipeline Project
Eastern Municipal Water District (EMWD) Cactus II Feeder Transmission Pipeline Project