Cactus II Feeder Transmission Pipeline Project

2 Documents in Project

Summary

SCH Number
2018061068
Lead Agency
Eastern Municipal Water District
Document Title
Cactus II Feeder Transmission Pipeline Project
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project involves the construction and operation of approx five miles of water transmission pipeline ranging from 30 in to 42 in in diameter. The proposed project would also include four turnouts to interconnect pumping lanes, a 30-in lateral pipeline along Nason St from Alessandro Blvd to Cottonwood Ave to connect to the Letterman Booster Pumping Station, and construction of transmission pipelines along Perris Blvd to connect to Turnout 2.

Contact Information
Claudia Steiding
Eastern Municipal Water District
P.O. Box 8300
Perris, CA 92572-8300

(951) 928-3777 x 4545

Location

Coordinates
33°54'36"N 117°14'36"W
Cities
Moreno Valley
Counties
Riverside
Cross Streets
Heacock St and Cactus Ave to Moreno Beach Dr and Cactus Ave
Zip
92553
State Highways
SR 60, I-215
Schools
VAR
Township
3S
Range
3W
Section
7-11,
Base
Sunnym

Notice of Determination

Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
2270 Trumble Road, Perris, CA 92570

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search