SCH Number 2018051031
Project Info
- Title
- 2017/18 Non-Potable Water Connections Project
- Description
- The project includes approximately 9.5 miles of non-potable water pipeline and connections mainly in public right of way in the city of Palm Desert and unincorporated Riverside County to provide irrigation water for seven local golf courses, one RV resort, one planned future development, and replacement of an existing pump station for a total online pumping capacity of approximately 12,000 gpm for the low pressure system and 12,000 gpm for the high pressure system, as well as a standby capacity of 8,000 gpm. The project would deliver a blend of NPW and Colorado River water from CVWD's existing Water Reclamation Plant 10.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Coachella Valley Water District (CVWD) | CVWD 2017/18 Non-Potable Water Connections Project | |
NOD | Coachella Valley Water District (CVWD) | 2017/18 Non-Potable Water Connections Project | |
MND | Coachella Valley Water District (CVWD) | 2017/18 Non-Potable Water Connections Project |