- IS/MND for Modjeska Boxcar Bridge Repairs Project
- Description
- Project is intended to protect the bridge structure and restore channel flood capacity. The Project consists of the removal of approx. 950 cubic yards of accumulated sediments from the streambed under and adjacent to the existing Boxcar Bridge; raising of the Boxcar Bridge approx. 3 feet; placement of engineered riprap in the streambed and approx. 600 linear feet along the banks; replacement of previously stockpiled native sediments over riprap located in the streambed; and removal and replacement of existing riprap at the bridge abutments.
3 documents in project