Modjeska Boxcer Bridge Repairs Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018041048
- Lead Agency
- Orange County
- Document Title
- Modjeska Boxcer Bridge Repairs Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/2/2018
- Present Land Use
- OS/OS /OS
- Document Description
- Project is intended to protect the bridge structure and restore channel flood capacity. The Project consists of the removal of approx. 950 cubic yards of accumulated sediments from the streambed under and adjacent to the existing Boxcar Bridge; raising of the Boxcar Bridge approx. 3 feet; placement of engineered riprap in the streambed and approx. 600 linear feet along the banks; replacement of previously stockpiled native sediments over riprap located in the streambed; and removal and replacement of existing riprap at the bridge abutments.
- Contact Information
-
Natalia Gaerlan
Orange County
300 N. Flower Street
Santa Ana, CA 92702
Phone : (949) 923-3759
Location
- Coordinates
- 33°42'34"N 117°37'11"W
- Counties
- Orange
- Cross Streets
- Eastern edge of Modjeska Canyon Rd
- Zip
- 92676
- Total Acres
- 0.60
- Parcel #
- 105-270-14
- Schools
- St. Michael Prep School
- Waterways
- Santiago Creek
- Other Location Info
- Modjeska
Notice of Determination
- Approving Agency
- County of Orange
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 300 N Flower St., First Foor, Santa Ana, CA 92702-4048
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.