SCH Number 2018041037
Project Info
- Title
- San Bernardino County Transportation Authority Lilac to Rancho Tracking Project
- Description
- San Bernardino County Transportation Authority (SBCT), as a Project proponent, is proposing to construct approximately three miles of a second main line track along the San Gabriel Subdivision, San bernardino line railroad corridor between Control Point (CP) Lilac Milepost 52.4 to approximately CP Rancho, near MP 55.1 in the cities of Rialto and San Bernardino. This second track would improve average train speed, travel times, reliability and overall capacity of the SBL.
2 documents in project