Lilac to Rancho Double Tracking
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2018041037
- Lead Agency
- San Bernardino County Transportation Authority
- Document Title
- Lilac to Rancho Double Tracking
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 10/15/2018
- Present Land Use
- light industrial, single family es, res suburban, res urban, and commercial
- Document Description
- San Bernardino County Transportation Authority (SBCT), as a Project proponent, is proposing to construct approximately three miles of a second main line track along the San Gabriel Subdivision, San bernardino line railroad corridor between Control Point (CP) Lilac Milepost 52.4 to approximately CP Rancho, near MP 55.1 in the cities of Rialto and San Bernardino. This second track would improve average train speed, travel times, reliability and overall capacity of the SBL.
- Contact Information
-
Victor Lopez
San Bernardino County Transportation Authority
Lead/Public Agency
1170 W. 3rd St, 2nd Floor
San Bernardino, CA 92410
Phone : (909) 884-8276
Location
- Cities
- Rialto San Bernardino
- Counties
- San Bernardino
- Cross Streets
- Cactus Ave to Rancho Ave, along San Bernardino Line RR corridor
- Total Acres
- 18
- Parcel #
- 13032408, 13101216, 13027128,
- State Highways
- I-215
- Railways
- SB Line RR
- Schools
- Curtis ES
- Township
- 1S
- Range
- 4, 5
- Section
- 7,11,
- Base
- SB
Notice of Determination
- Approving Agency
- SBCTA
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1170 W. 3rd Street, 2nd Floor, San Bernardino, CA 92410
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.