SCH Number 2018031082
Project Info
- Title
- Maple Avenue Pedestrian Overhead Structure Project
- Description
- The project would construct a pedestrian overhead structure across the UPRR at South Maple Ave. Two build alternatives are under consideration: The Build Alternatives consist of two potential approach (takeoff/landing ramp) designs for the north side of the overhead structure proposed for consideration-the East Side Landing Alternative would have a takeoff/landing ramp on the east side of S. Maple Ave and the West Side Landing Alternative would have a takeoff/landing ramp on the west side of S. Maple Ave. The southern approach, located in the southeast quadrant of the intersection of S. Maple Ave and the UPRR at-grade crossing, would remain the same under both Alternatives. Pedestrian would access the south side ramp via a spiraled ramp constructed on the northwest corner of the existing HS parking lot.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
FIN | Alameda Corridor-East Construction Authority (ACE) | Maple Avenue Pedestrian Overhead Structure Project | |
NOD | Alameda Corridor-East Construction Authority (ACE) | Maple Avenue Pedestrian Overhead Structure Project | |
MND | Alameda Corridor-East Construction Authority (ACE) | Maple Avenue Pedestrian Overhead Structure Project |