SCH Number 2017088223


Project Info

Title
Eureka Dock Limited Piling Replacement Project
Description
Project implementation will involve: * Replacement of 28 deteriorated 12-inc to 18-inch-diameter wooden fender pilings with 28 12-inch diameter steel pilings; * Replacement of four deteriorated 12-inch to 18-inch diameter wooden structural pilings with four 12-inch diameter steel pilings; and * Addition of eight 12-inch diameter steel strucutural pilings. A steel chip conveyor structure is positioned at the central portion of the dock and is used to transfer wood chips from the wood chip stockpiles to docked barges. The new steel pipe pilings will be installed under the existing chip conveyor to reinforce the four existing wooden structural piliings.
Download CSV New Search

 

1 documents in project

Type Lead/Public Agency Received Title
Regional Water Quality Control Board, Region 1 (North Coast), Santa Rosa Eureka Dock Limited Piling Replacement Project