SCH Number 2017081006
Project Info
- Title
- Cucamonga Creek Basin 6, 7 and 8 Maintenance and Operation
- Description
- The California Department of Fish and Wildlife has executed Streambed Alteration Agreement number 1600-2017-0148-R6, pursuant to section 1602 to Fish and Game Code to San Antonio Water Company. The Basin 6 Infiltration Restoration project includes the one time dewatering and desilting of sub-basin A3 of Basin 6 in order to allow for increased groundwater recharge capability. Dewatering includes pumping and discharging water downstream into Basins 7 and 8, then into the confluence with Cucamonga Creek channel. Soils will be tested for permeability through drilling and trenching within the basin bottom. San Antonio Water Company shall not disturb any habitat or vegetation above the 1510 foot elevation in its desilting and recharge efforts. The basin floor will be ripped to a depth of minimum 12 inches as determined by the geotechnical consultant, and then smoothed. All side slopes will be track-walked with heavy equipment in an up and down matter that is approved to break up hardened surface of the uppermost layer.
3 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | San Bernardino Flood Control District | Cucamonga Creek Basin 6, 7 and 8 Maintenance and Operation | |
MND | San Bernardino Flood Control District | Cucamonga Creek Basin 6, 7 and 8 Maintenance and Operation | |
MND | San Bernardino Flood Control District | Cucamonga Creek Basin 6, 7 and 8 Maintenance and Operation |