SCH Number 2017072049


Project Info

Title
Fulton-Fitch Mountain Reconductoring Project (Project)
Description
The Final Initial Study/Mitigated Negative Declaration {IS/MND} of the Project was adopted in 2017 by California Public Utilities Commission (CPUC). This Supplemental IS/MND analyzes proposed changes to the Project since the CPUC adopted the Final IS/MND in 2017. Following the CPUC's approval of the Project, PG&E identified corrosion on the cross-arms of tubular steel poles (TSPs) in the Southern Segment of the Project that could potentially cause cross-arm failure during reconductoring activities. To address the risk of cross-arm failure, PG&E proposes to replace 21 existing TSPs in the Southern Segment of the Project that support the Fulton-Hopland 60-kilovolt (kV) Power Line, Geysers #12-Fulton 230-kV Transmission Line, and Geysers #17-Fulton 230-kV Transmission Line, rather than reconductoring on the existing TSPs as stated in the 2017 Final 1S/MND.
Download CSV New Search

 

5 documents in project

Type Lead Agency Received Title
California Public Utilities Commission Fulton-Fitch Mountain Reconductoring Project
California Public Utilities Commission Fulton-Fitch Mountain Reconductoring Project (Project)
California Public Utilities Commission Fulton-Fitch Mountain Reconductoring Project (Project)
California Public Utilities Commission Fulton-Fitch Mountain Reconductoring Project
California Public Utilities Commission Fulton-Fitch Mountain Reconductoring Project

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.