SCH Number 2017062072
Project Info
- Title
- Town Center Force Main Replacement Phase 2
- Description
- The El Dorado Irrigation District plans to install 12,885 ft of new ten inch force main in El Dorado Rd and Mother Lode Dr. The existing force main pipeline consists of approx 12,885 ft of eight in asbestos cement pipe and 1,208 ft of ten inch PVC pipe.
2 documents in project