Town Center Force Main Replacement Phase 2
2 Documents in Project
Summary
SCH Number
2017062072
Lead Agency
El Dorado Irrigation District
Document Title
Town Center Force Main Replacement Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2017
Present Land Use
El Dorado County ROW
Document Description
The El Dorado Irrigation District plans to install 12,885 ft of new ten inch force main in El Dorado Rd and Mother Lode Dr. The existing force main pipeline consists of approx 12,885 ft of eight in asbestos cement pipe and 1,208 ft of ten inch PVC pipe.
Contact Information
Name
Bret Sampson
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Placerville
Counties
El Dorado
Cross Streets
Mother Lode Dr and El Dorado Rd
Parcel #
county ROW
State Highways
50
Township
10N
Range
10E
Section
22
Base
MD
Notice of Determination
Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.