Happy Camp Wastewater Bridge Pipeline Crossing Project
Description
The Project consists of the following components: • At the Lift Station o Epoxy coating of the interior of the wet well and wet well piping; o Installation of submersible pumps, floats, electrical cables, and hoist; o Installation of eight-inch sewer main (i.e., inlet piping to the lift station) and new manhole on Indian Creek Road, east of Indian Creek Bridge; o Installation of remote lift station control panel, the main electrical control panels, and the standby generator on Elk Creek Road; • Connection of the four-inch force main to the existing gravity sewer via a new drop manhole (Manhole #2) and a new manhole at the gravity sewer (Manhole #1); • Equipment/System Testing; and • Abandonment of siphon chamber and siphon with flowable slurry. The first phase of the larger project has already been constructed which consisted of the following components: • Installation of the four-inch force main inside the bridge; • Installation the wet well, dry well and piping for the lift station; • Purchase of the lift station pumps; and • Installation of conduit under State Highway 96 from the lift station to the main controls/stand-by generator at Elk Creek Road.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Happy Camp Sanitation District Happy Camp Wastewater Bridge Pipeline Crossing Project
Happy Camp Sanitation District Happy Camp Wastewater Bridge Pipeline Crossing Project
Happy Camp Sanitation District Happy Camp Indian Creek Sewer Pipeline Crossing
Happy Camp Sanitation District Indian Creek Sewer Pipeline Crossing