SCH Number 2017032070
Project Info
- Title
- Happy Camp Wastewater Bridge Pipeline Crossing Project
- Description
- The Project consists of the following components: • At the Lift Station o Epoxy coating of the interior of the wet well and wet well piping; o Installation of submersible pumps, floats, electrical cables, and hoist; o Installation of eight-inch sewer main (i.e., inlet piping to the lift station) and new manhole on Indian Creek Road, east of Indian Creek Bridge; o Installation of remote lift station control panel, the main electrical control panels, and the standby generator on Elk Creek Road; • Connection of the four-inch force main to the existing gravity sewer via a new drop manhole (Manhole #2) and a new manhole at the gravity sewer (Manhole #1); • Equipment/System Testing; and • Abandonment of siphon chamber and siphon with flowable slurry. The first phase of the larger project has already been constructed which consisted of the following components: • Installation of the four-inch force main inside the bridge; • Installation the wet well, dry well and piping for the lift station; • Purchase of the lift station pumps; and • Installation of conduit under State Highway 96 from the lift station to the main controls/stand-by generator at Elk Creek Road.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Happy Camp Sanitation District | Happy Camp Wastewater Bridge Pipeline Crossing Project | |
FYI | Happy Camp Sanitation District | Happy Camp Wastewater Bridge Pipeline Crossing Project | |
NOD | Happy Camp Sanitation District | Happy Camp Indian Creek Sewer Pipeline Crossing | |
NEG | Happy Camp Sanitation District | Indian Creek Sewer Pipeline Crossing |