SCH Number 2017011065
Project Info
- Title
- Flagler Wells Conversion Pipeline Project
- Description
- The Elsinore Valley water District converted Well 2A and 3A frm agricultural wells to domestic water wells. The conversion involved installing sand separrators anf two 30 horsepower well pumps. A 12-foot tall 2,400 square-foot booster pump station was installed within the project area. A chlorination system, including a sodium hypochlorite tank, a steel chlorine contact tank, ammonia storage, chemical feed metering systems, mixers, and associated piping was added to the system. A 100-foot long, 12-inch pipe was laid to connect the system to booster pump station. A 140 foot long pipe was installed to connect the booster pump station to the Temescal Valley pipeline. A 220-foot long, 18-inch diameter piping was also installed from the catch basin/storm basin drain inlet at the water treatment plant to an existing storm drain for well flushing. The Project will provide for the operation of the system.
2 documents in project