Operations of Elsinore Valley Municipal Water District - Flagler Wells Conversion Pipeline Project (project)

2 Documents in Project

Summary

SCH Number
2017011065
Lead Agency
Elsinore Valley Municipal Water District
Document Title
Operations of Elsinore Valley Municipal Water District - Flagler Wells Conversion Pipeline Project (project)
Document Type
NOD - Notice of Determination
Received

Document Description
The Elsinore Valley water District converted Well 2A and 3A frm agricultural wells to domestic water wells. The conversion involved installing sand separrators anf two 30 horsepower well pumps. A 12-foot tall 2,400 square-foot booster pump station was installed within the project area. A chlorination system, including a sodium hypochlorite tank, a steel chlorine contact tank, ammonia storage, chemical feed metering systems, mixers, and associated piping was added to the system. A 100-foot long, 12-inch pipe was laid to connect the system to booster pump station. A 140 foot long pipe was installed to connect the booster pump station to the Temescal Valley pipeline. A 220-foot long, 18-inch diameter piping was also installed from the catch basin/storm basin drain inlet at the water treatment plant to an existing storm drain for well flushing. The Project will provide for the operation of the system.

Contact Information
Amy Czajkowski
State Water Resources Control Board
Riverside District 1350 Front Street, Rm 2050
San Diego, CA 92101

760-518-6266

Location

Coordinates
33°49'30.4"N 117°30'37.3"W
Cities
Corona
Counties
Riverside
Cross Streets
Temescal Canyon Rd and Cajalco Rd
Zip
92881
Total Acres
1.5
Parcel #
279231-008, 079, 083, 085
State Highways
15
Schools
El Cerrito ES, Wilson Woodrow ES
Waterways
Unnamed golf course ponds
Township
4S
Range
6W
Section
16
Base
SB

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Elsinore Valley Minicipal Water District

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search