SCH Number 2016082082


Project Info

Title
LeLand Reservoir Replacement Project
Description
EBMUD proposes replacing the existing 18-million-gallon (MG) open-cut Leland Reservoir with two new 8-MG prestressed concrete tanks within the existing reservoir basin. The project also includes replacing approx. 1,700 linear feet of existing 36-inch transmission pipeline that currently runs beneath the reservoir with approx. 2,700 linear feet of pipeline to be constructed in Windsor Drive, Condit Road and a short section of Leland Drive between Condit Road and Meek Place, and approx. 950 feet of 36-in pipeline within the Leland Reservoir site. A new 30-in storm drain pipeline would also be installed on site and connected to the city of Lafayette's existing storm drain system at the intersection of Leland Dr and Patty Way.
Download CSV New Search

 

5 documents in project

Type Lead/Public Agency Received Title
East Bay Municipal Utility District (EBMUD) LeLand Reservoir Replacement Project
East Bay Municipal Utility District (EBMUD) LeLand Reservoir Replacement Project
East Bay Municipal Utility District (EBMUD) LeLand Reservoir Replacement Project
East Bay Municipal Utility District (EBMUD) LeLand Reservoir Replacement Project
East Bay Municipal Utility District (EBMUD) LeLand Reservoir Replacement Project