Document Description
EBMUD proposes replacing the existing 18-million-gallon (MG) open-cut Leland Reservoir with two new 8-MG prestressed concrete tanks within the existing reservoir basin. The project also includes replacing approx. 1,700 linear feet of existing 36-inch transmission pipeline that currently runs beneath the reservoir with approx. 2,700 linear feet of pipeline to be constructed in Windsor Drive, Condit Road and a short section of Leland Drive between Condit Road and Meek Place, and approx. 950 feet of 36-in pipeline within the Leland Reservoir site. A new 30-in storm drain pipeline would also be installed on site and connected to the city of Lafayette's existing storm drain system at the intersection of Leland Dr and Patty Way.
Contact Information
Name
Oscar Herrara
Agency Name
East Bay Municipal Utility District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Lafayette
Counties
Contra Costa
Cross Streets
1050 Leland Drive, Condit Road, Windsor Drive, Old Tunnel Road, Meek Place
Zip
94549
Total Acres
14.5
Parcel #
185-052-001-4
State Highways
24
Railways
BART
Schools
Meher Schools
Waterways
Reliez Creek, LAs Trampas Creek
Township
1N
Range
2W
Section
33
Base
MD
Notice of Determination
Approving Agency
East Bay Municipal Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.