SCH Number 2016068221


Project Info

Title
Downtown Anaheimm Recycled Water Expansion Project
Description
This is a two-phased project that will replace the use of potable water currently use to irrigate approximately 438,000 square feet (s.f.) of landscaping at Pearson Park in downtown Anaheim Boulevard with recycled water. Phase 1 construction consists of trenching to a depth of 4-5 ft along Center St, Anaheim Blvd, and Cypress Street in order to install approximately 2,300 linear feet (l.f.) of recycled water pipeline. The newly installed pipeline will connect to the pipelines of the existing WRDF. Also included in Phase 1 is excavation at the southeast end of Person Park for the installation of an underground 75,000 gallon recycled water storage tank, an irrigation pump, and related hardware. The excavation is to be approximately 40' x 70' or equivalent area to a maximum depth of 16'. Phase 2 consists of the installation of 800 l.f. of pipeline, and an underground 36,000 gallon storage tank at the southwest side of Pearson Park.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Anaheim Downtown Anaheimm Recycled Water Expansion Project
City of Anaheim Downtown Anaheimm Recycled Water Expansion Project