SCH Number 2016068215
Project Info
- Title
- MD-1 Hidden Lakes Water Distribution System Improvements - Feasibility Study & Design
- Description
- The State Water Resources Control Board (SWRCB) is the responsible agency. The County of Madera proposes to conduct a feasibility study to draft design and specs of the MD-1 infrastruicture improvements. The improvements will be to replace aged/leaky distribution pipes, evaluate the fireflow requirements of the water mains, replacement of the raw water line, and adding hydrants to the Water System.
2 documents in project