MD-1 Hidden Lakes Water Distribution System Improvements - Feasibility Study & Design

2 Documents in Project

Summary

SCH Number
2016068215
Public Agency
Madera County
Document Title
MD-1 Hidden Lakes Water Distribution System Improvements - Feasibility Study & Design
Document Type
NOE - Notice of Exemption
Received
Posted
7/5/2017
Document Description
The State Water Resources Control Board (SWRCB) is the responsible agency. The County of Madera proposes to conduct a feasibility study to draft design and specs of the MD-1 infrastruicture improvements. The improvements will be to replace aged/leaky distribution pipes, evaluate the fireflow requirements of the water mains, replacement of the raw water line, and adding hydrants to the Water System.

Contact Information

Name
Bridget Binning
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Madera
Other Location Info
Hidden Lakes

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15306 - Class 6
Reasons for Exemption
Information Collection

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print