SCH Number 2016062026
Project Info
- Title
- Barry School Water Line Extension Project
- Description
- The proposed project involves constructing a 3-inch diameter water line approximately 1.22 miles long, along Railroad Ave and Barry Road. The water service line would begin from the intersection of Railroad Ave and Stewart Rd, where it would connect to two proposed water mains, 14-inches and 12-inches in diameter. The proposed 14-inch water main will run south on Railroad Ave from Tuscan Rd for approximately 0.57 miles. The 12-inch water main will run west for 0.56 miles from the Yuba City limits located near Riverbend Elementary School. The proposed project would result in approximately 2.35 miles of additional water service pipeline.
3 documents in project