Barry Elementary School Water Line Extension

3 Documents in Project

Summary

SCH Number
2016062026
Lead Agency
Yuba City
Document Title
Barry Elementary School Water Line Extension
Document Type
NOD - Notice of Determination
Received
Posted
6/15/2022
Document Description
The State Water Resources Control Board (State Water Board) is a Responsible Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project consists of constructing a 3-inch diameter water line approximately 1.22 miles long, along Railroad Avenue and Barry Road. The water service line would begin from the intersection of Railroad Avenue and Stewart Road, where it would connect to two proposed water mains, 14-inches and 12-inches in diameter. The proposed 14-inch water main will run south on Railroad Avenue from Tuscan Road for approximately 0.57 miles. The 12-inch water main will run west for 0.56 miles from the Yuba City limits located near Riverbend Elementary School. The proposed Project would result in approximately 2.44 miles of additional water service pipeline. Trenching for the pipeline installation will typically be limited to between three to five-foot depth below ground surface and between three to four feet in width. Approximately 1.2 acres of ground disturbance is anticipated for the Project construction.

Contact Information

Name
Gabriel Edwards
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Yuba City
Counties
Sutter
Regions
Citywide
Cross Streets
Barry Rd, Railroad Ave and Stewart Rd
Zip
95993
Total Acres
1.2
State Highways
99
Railways
Southern Pacific RR
Airports
Sutter County Airport
Waterways
Feather River
Township
14N
Range
3E
Section
3, 10
Base
MDBM

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sutter
Final Environmental Document Available at
1201 Civic Center Boulevard Yuba City, CA 95993

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print