SCH Number 2015072055


Project Info

Title
Del Rio Tank and Wells Project
Description
The proposed project involves the construction and operation of water wells, a storage tank, and associated distribution facilities at two sites, Site A and Site B. The Proposed Project would develop a total of approx. 4.4 acres (approx. 190,000 sq. ft.). The City of Modesto provides water service to the community of Del Rio. The Del Rio water system currently requires a new storage tank (and associated pump station), well, replacement well, backup generators, and pipelines to correct existing supply deficiencies. The existing Del Rio water system does not meet certain design pressure and storage volume requirements identified in the 2010 Water System Engineer's Report for water supply and fire-flow demand. The existing Del Rio water system also is not sufficient to supply anticipated future growth in the Del Rio area. the City intends to decommission one of its Del Rio water system wells (Well 271) when the new replacement well is brought online.
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
City of Modesto Del Rio Tank and Wells Project
City of Modesto Del Rio Tank and Wells Project
City of Modesto Del Rio Tank and Wells Project
City of Modesto Del Rio Tank and Wells Project