Del Rio Tank and Wells Project
4 Documents in Project
Summary
SCH Number
2015072055
Lead Agency
City of Modesto
Document Title
Del Rio Tank and Wells Project
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2017
Present Land Use
Stanislaus County Sphere of Influence
Document Description
The proposed project involves the construction and operation of water wells, a storage tank, and associated distribution facilities at two sites, Site A and Site B. The Proposed Project would develop a total of approx. 4.4 acres (approx. 190,000 sq. ft.). The City of Modesto provides water service to the community of Del Rio. The Del Rio water system currently requires a new storage tank (and associated pump station), well, replacement well, backup generators, and pipelines to correct existing supply deficiencies. The existing Del Rio water system does not meet certain design pressure and storage volume requirements identified in the 2010 Water System Engineer's Report for water supply and fire-flow demand. The existing Del Rio water system also is not sufficient to supply anticipated future growth in the Del Rio area. the City intends to decommission one of its Del Rio water system wells (Well 271) when the new replacement well is brought online.
Contact Information
Name
Tamorah Bryant
Agency Name
City of Modesto
Contact Types
Lead/Public Agency
Address
Phone
Location
Coordinates
Cities
Modesto
Counties
Stanislaus
Cross Streets
Site A: Ladd Road at St. John Road; Site B: Stewart Road at McHenry Avenue
Zip
95356
Total Acres
2.4
Parcel #
004-007-018, 004-102-003
State Highways
Hwy 108; 219
Schools
Stanislaus ES
Waterways
Stanislaus River
Township
2S
Range
9E
Section
29
Base
MDB&M
Notice of Determination
Approving Agency
City of Modesto
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.