SCH Number 2015062077


Project Info

Title
Navy Drive Widening
Description
Project consists of widening Navy Drive from two to four lanes. The total pavement width would be between 70 and 80 feet wide consisting of 1) four continuous 12-foot travel lanes, 2) a center turn lane between the Nave Drive/ Washington Street intersection and the Navy Drive/BNSF railroad underpass intersection to allow for turning into and out of business along that portion of Navy Drive, and 3) shoulders on both sides of Navy Drive ranging from 2 to four feet in width.
Download CSV New Search

 

4 documents in project

Type Lead Agency Received Title
Port of Stockton Navy Drive Widening Project
Port of Stockton Navy Drive Widening Project
Port of Stockton Navy Drive Widening
Port of Stockton Navy Drive Widening

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.