SCH Number 2015032004
Project Info
- Title
- Keena / Bell Pipeline Replacement Project
- Description
- The proposed project involves replacing an existing 14-inch diameter treated water pipeline with 18-inch diameter ductile iron pipe. The pipeline would be installed in existing roadways and a portion would traverse the nearby hillside. The new 2,100-foot-long pipeline system would provide a more reliable conveyance of treated water.
2 documents in project