SCH Number 2015021013


Project Info

Title
Wellhead Equipping for Well No. 21 & Richfield Road Pipeline Project
Description
State Water Board, as the responsible agency, will be issuing a water supply permit. The Yorba Linda Water District will drill a 3,000 gallon per minute well and install a 400 horsepower motor. A 16-inch 725 foot pipe will be installed from the well to Richfield Road, and a 1,975 foot pipeline will be installed under Richfield Road. The pipeline will transition from a 20-inch pipe to a 36-inch pipe at its end. The pipe will transport untreated water to the hypochlorite generation system for chlorination. A 10-inch diameter 104 foot waste discharge line was also installed from the well to an existing waste discharge structure. A spillway, airgap structure, and flow dissipater will also be installed. Electrical service will be provided to the project by the City of Anaheim Public Utilities Dept., and a new transformer and associated infrastructure will be installed at the well site. A Programmable Logic Controller and Supervisory Control and Data Acquisition system will provide control and monitoring of the well. The project will provide for the operation of these facilities.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
Yorba Linda Water District Construction and Operation of Well 21 & Richfield Road Pipeline Project
Yorba Linda Water District Wellhead Equipping for Well No. 21 & Richfield Road Pipeline Project