SCH Number 2015021003
Project Info
- Title
- Santa Ana River Mainstem: Reach 9 BNSF Railroad Bridge Protection
- Description
- Note: Review per lead The U.S. Army Corps of Engineers proposes minor changes to the BNSF bridge protection features that were approved for construction in 2015. Approx 2.29 acres of permanent impacts and 7.13 acres of temporary impacts are expected to be added to the BNSF bridge protection project footprint. An update to the EA and EIR is required to address this expanded permanent project footprint (minor expansion of the bridge piers and abutment wall), modifications to the temporary construction/staging work areas on both the east and west side of the Santa Ana River, re-alignment of a permanent maintenance access road closer to the Green River Mobile Home Park, and design refinements to accommodate additional project features, such as the addition of permanent survey monuments.
4 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
ADM | United States Army, Army Corps of Engineers (USACE) | Santa Ana River Mainstem: Reach 9 BNSF Railroad Bridge Protection | |
ADM | United States Army, Army Corps of Engineers (USACE) | Santa Ana River: Reach 9 Phase 5A | |
ADM | United States Army, Army Corps of Engineers (USACE) | Santa Ana River: Reach 9 Phase 5B | |
EIR | United States Army, Army Corps of Engineers (USACE) | Santa Ana River: Reach 9 Phases 4, 5A, 5B, & BNSF Bridge |