- Port of Stockton Maintenance Dredging Docks 2, 3, 12, and 13
- Description
- The project is limited to maintenance dredging of sediments from in front of existing docks 2, 3, 12, and 13 at the Port of Stockton's East Complex on the Stockton Deep Water Ship Channel. The berthing areas at docks 2 and 3 will be dredged to a depth of 35 feet below mean lower low water (MLLW). The berthing areas at docks 12 and 13 will be dredged to a depth of 40 feet below MLLW. Dredged material will be removed by a hydraulic dredge and transported via pipeline to the designated dredge material confinementarea (MDCA) on Roberts Island No. 1 and/or a portion of Rough and Ready Inland. SAA #1600-2014-0169-R3.