Port of Stockton Maintenance Dredging Docks 2, 3, 12, and 13

2 Documents in Project

Summary

SCH Number
2014098101
Lead Agency
Fish & Wildlife 3 (Napa) (California Department of Fish and Wildlife, Region 3)
Document Title
Port of Stockton Maintenance Dredging Docks 2, 3, 12, and 13
Document Type
NOE - Notice of Exemption
Received
Posted
9/17/2014

Document Description
The project is limited to maintenance dredging of sediments from in front of existing docks 2, 3, 12, and 13 at the Port of Stockton's East Complex on the Stockton Deep Water Ship Channel. The berthing areas at docks 2 and 3 will be dredged to a depth of 35 feet below mean lower low water (MLLW). The berthing areas at docks 12 and 13 will be dredged to a depth of 40 feet below MLLW. Dredged material will be removed by a hydraulic dredge and transported via pipeline to the designated dredge material confinementarea (MDCA) on Roberts Island No. 1 and/or a portion of Rough and Ready Inland. SAA #1600-2014-0169-R3.

Contact Information
Andrea Boertien
California Department of Fish and Wildlife, Region 3
7329 Silverado Trail
Napa, CA 94558

Phone : (209) 234-3449

Location

Cities
Stockton
Counties
San Joaquin

Notice of Exemption

Exempt Status
Other

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print