SCH Number 2014051023


Project Info

Title
Plant 3A Effluent Transmission Main Replacement Project MNWD Project 2009.115
Description
A 30-inch diameter, 298-foot long treated effluent pipeline is proposed to be installed via microtunneling beneath the concrete channelized San Juan Creek as a replacement for MWND's Plant 3A effluent transmission main (ETM) under co-ownership with Santa Margarita Water District (SMWD). Construction would last approximately nine weeks, beginning in November 2014, and would be limited to the two staging areas and pits on the north and south side of San Juan Creek. Operation of the proposed project would be entirely underground with the exception of occasional maintenance.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
Moulton Niguel Water District Plant 3A Effluent Transmission Main Replacement Project MNWD Project 2009.115
Moulton Niguel Water District Plant 3A Effluent Transmission Main Replacement Project MNWD Project 2009.115

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.