SCH Number 2014042067
Project Info
- Title
- Salyer Water System Improvement Project
- Description
- The Department's Safe Drinking Water State Revolving Fund Program is providing state funds for the project. The Salyer Mutual Water Company is proposing to install a new 4" water main, 6" distribution main, and telemetry cable from the pump house to the Salyer MWC Water Treatment Plant site. The project will involve subsurface pipeline installation and require relatively shallow trenching activities. Two new lateral pipelines will be installed along the length of the main distribution line to service two 6" blow off valves. The existing water storage tank will be converted to a backwash facility and new pipe, pumps, filters, chemical treatment, and 100,000 gallon storage tank will be added.
2 documents in project