Salyer Mutual Water Company Water System Improvement Project

2 Documents in Project

Summary

SCH Number
2014042067
Lead Agency
Public Health, Department of (California Department of Public Health)
Document Title
Salyer Mutual Water Company Water System Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2014
Present Land Use
Residential, Village

Document Description
The Department's Safe Drinking Water State Revolving Fund Program is providing state funds for the project. The Salyer Mutual Water Company is proposing to install a new 4" water main, 6" distribution main, and telemetry cable from the pump house to the Salyer MWC Water Treatment Plant site. The project will involve subsurface pipeline installation and require relatively shallow trenching activities. Two new lateral pipelines will be installed along the length of the main distribution line to service two 6" blow off valves. The existing water storage tank will be converted to a backwash facility and new pipe, pumps, filters, chemical treatment, and 100,000 gallon storage tank will be added.

Contact Information
Bridget Binning
California Department of Public Health
1616 Capitol Avenue, MS 7418 P.O. Box 997413
Sacramento, CA 95899-7413

Phone : (916) 449-5600

Location

Counties
Trinity
Cross Streets
Highway 299 and Campbell Ridge Rd
Zip
95563
State Highways
Hwy 299
Waterways
Trinity River
Other Location Info
Salyer

Notice of Determination

Approving Agency
California Department of Public Health
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Division of Drinking Water and Environmental MAnagement at the Department's Headquaterters' office in Sacramento.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search