SCH Number 2014022022
Project Info
- Title
- Graham Hill Road Bridge Storm Damage Repair Project tion
- Description
- The repair work will consist of removing the existing wing wall and pouring a new concrete wing wall in the same location. The new wing wall will be doweled into the face of the existing bridge abutment to help provide bearing support for the bridge. Rock slope protection (RSP) will be installed around the new wing wall. A drain will be installed at the edge of the sidewalk, leading to a culvert along the edge of the new RSP, with an outfall at the bottom of the RSP. The portion of the sidewalk that has been undercut will be replaced. The County will also install RSP at the base of the pier in the channel to prevent further scour. Equipment may access the site from an existing construction staging yard on the north side of Channel 1. Prior to construction, a path will be cleared across the riparian woodland and Channel 1 wide enough to allow equipment access to the wing wall. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2014-0135-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Todd Sexauer, Santa Cruz County Department of Public Works.
3 documents in project