Graham Hill Road Bridge Storm Damage Repair Project

3 Documents in Project

Summary

SCH Number
2014022022
Lead Agency
Santa Cruz County
Document Title
Graham Hill Road Bridge Storm Damage Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
3/30/2015
Present Land Use
GP: Road right-of-way and Mountain Residential Z: Road right-of-way and Residential Agriculture
Document Description
The repair work will consist of removing the existing wing wall and pouring a new concrete wing wall in the same location. The new wing wall will be doweled into the face of the existing bridge abutment to help provide bearing support for the bridge. Rock slope protection (RSP) will be installed around the new wing wall. A drain will be installed at the edge of the sidewalk, leading to a culvert along the edge of the new RSP, with an outfall at the bottom of the RSP. The portion of the sidewalk that has been undercut will be replaced. The County will also install RSP at the base of the pier in the channel to prevent further scour. Equipment may access the site from an existing construction staging yard on the north side of Channel 1. Prior to construction, a path will be cleared across the riparian woodland and Channel 1 wide enough to allow equipment access to the wing wall. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2014-0135-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Todd Sexauer, Santa Cruz County Department of Public Works.

Contact Information

Name
Melissa Farinha
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Graham Hill Road and Hwy 9
Zip
95018
Total Acres
.1
Parcel #
right-of-way
State Highways
Hwy 9
Railways
Roaring Camp RR
Airports
No
Schools
St. Lawrence Academy
Waterways
San Lorenzo River
Township
10S
Range
2W
Base
MDB&M
Other Location Info
Felton Planning Area

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.