SCH Number 2013101080


Project Info

Title
Agua Mansa Logistics Center
Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0196-R6 (Revision 2), pursuant to section 1602 of the Fish and Game Code to the project Applicant, Howard Industrial Partners. The project includes the installation of a water line, future sewer line, and electrical conduits under Rialto Channel. the waterline would be performed by installing a jack and bore 70' x 24" steel casing using a 20' x 24' jacking pit and 15' x 12' receiving pit on each end of the casing/pipe segment, where each pit is located at a minimum of 10 feet from the edge of the bridge deck and Rialto Channel walls. The 24-inch steel casing will cross underneath the concrete rectangular/box channel with a 2 foot clearance between bottom of concrete channel and top of casing. The new waterline would be located within the City of Colton right-of-way along Agua Mansa Road. In addition, two 24" steel casings will be installed concurrently with the water pipeline: 1) for a future sewer line; and 2) for electrical conduits. The two additional steel casings will be installed at the same elevation of the water pipeline and will be spaced 3' apart from each other.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of Colton Agua Mansa Logistic Center and Domestic Water Improvement Project (Streambed Alteration Agreement No. 1600-2017-0196-R6 [Revision 2])
City of Colton Agua Mansa Logistics Center