Agua Mansa Logistic Center and Domestic Water Improvement Project (Streambed Alteration Agreement No. 1600-2017-0196-R6 [Revision 2])

2 Documents in Project

Summary

SCH Number
2013101080
Lead Agency
City of Colton
Document Title
Agua Mansa Logistic Center and Domestic Water Improvement Project (Streambed Alteration Agreement No. 1600-2017-0196-R6 [Revision 2])
Document Type
NOD - Notice of Determination
Received
Posted
3/20/2018
Present Land Use
Paintball Gaming Facility / Heavy Industrial (M-2) / Heavy Industrial (M-2)
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0196-R6 (Revision 2), pursuant to section 1602 of the Fish and Game Code to the project Applicant, Howard Industrial Partners. The project includes the installation of a water line, future sewer line, and electrical conduits under Rialto Channel. the waterline would be performed by installing a jack and bore 70' x 24" steel casing using a 20' x 24' jacking pit and 15' x 12' receiving pit on each end of the casing/pipe segment, where each pit is located at a minimum of 10 feet from the edge of the bridge deck and Rialto Channel walls. The 24-inch steel casing will cross underneath the concrete rectangular/box channel with a 2 foot clearance between bottom of concrete channel and top of casing. The new waterline would be located within the City of Colton right-of-way along Agua Mansa Road. In addition, two 24" steel casings will be installed concurrently with the water pipeline: 1) for a future sewer line; and 2) for electrical conduits. The two additional steel casings will be installed at the same elevation of the water pipeline and will be spaced 3' apart from each other.

Contact Information

Name
Claire Ingel
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Colton
Counties
San Bernardino
Cross Streets
Riverside Avenue and Rancho Road
Zip
92324
Total Acres
43.1
Parcel #
0260-072-01, -02, -03, -04, -15, -16
State Highways
I-10
Railways
UPRR
Waterways
Santa Ana River
Township
1S
Range
5W
Section
36
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes