SCH Number 2013041047


Project Info

Title
Mountain View Park Well Improvements Project
Description
SWRCB, as the responsible agency, will be issuing a water supply permit. The city of Chino drilled a 580-foot, 802 gallon per minute well and installed a 125-horse power pump on February 18, 2015. A 4-inch diameter 583 foot long pipe was installed to connect the well to a pump-to-waste line in November 2016. In April 2017, an 8-18 inch wide, 12,450 feet long raw water pipeline was installed to connect the well to the existing regional treatment plant and provide for two future well connections. A 6-foot by 8-foot electronic transformer pad and a 22.4 sq. ft., 5.5 foot tall transformer were installed in May. An 8-inch by 19-foot pump to waste- pipeline was laid in June, to allow for water waste to discharge to an existing catch basin and then the storm drain. In July, a 35-foot by 26-foot driveway for access was constructed. 2,500 feet of paving was installed. One month later, an 18-foot by 36-foot building was completed to house the well and the well's electrical system. 226 feet of 6-foot fencing was installed around the well. The water system project is a part of a larger project that demolished an agricultural well, well building, and transformer at the same site, re-landscaped the area around the demolished structures, built a 256 sq. ft. equipment storage building, and installed an east-west pipeline for storm water. The project will provide for the operation of these facilities.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of Chino Operation of Mountain View Park Well Improvement Project (Well 19)
City of Chino Mountain View Park Well Improvements Project
City of Chino Mountain View Park Well Improvements Project