Operation of Mountain View Park Well Improvement Project (Well 19)

3 Documents in Project

Summary

SCH Number
2013041047
Lead Agency
City of Chino
Document Title
Operation of Mountain View Park Well Improvement Project (Well 19)
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2017
Present Land Use
Park Land/Open Space Recreational (OS-1)/as Recreation/Open Space (R/OS)
Document Description
SWRCB, as the responsible agency, will be issuing a water supply permit. The city of Chino drilled a 580-foot, 802 gallon per minute well and installed a 125-horse power pump on February 18, 2015. A 4-inch diameter 583 foot long pipe was installed to connect the well to a pump-to-waste line in November 2016. In April 2017, an 8-18 inch wide, 12,450 feet long raw water pipeline was installed to connect the well to the existing regional treatment plant and provide for two future well connections. A 6-foot by 8-foot electronic transformer pad and a 22.4 sq. ft., 5.5 foot tall transformer were installed in May. An 8-inch by 19-foot pump to waste- pipeline was laid in June, to allow for water waste to discharge to an existing catch basin and then the storm drain. In July, a 35-foot by 26-foot driveway for access was constructed. 2,500 feet of paving was installed. One month later, an 18-foot by 36-foot building was completed to house the well and the well's electrical system. 226 feet of 6-foot fencing was installed around the well. The water system project is a part of a larger project that demolished an agricultural well, well building, and transformer at the same site, re-landscaped the area around the demolished structures, built a 256 sq. ft. equipment storage building, and installed an east-west pipeline for storm water. The project will provide for the operation of these facilities.

Contact Information

Name
Eric Zuniga
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Chino
Counties
San Bernardino
Cross Streets
Southeast corner of Chino Avenue and Mountain Avenue
Total Acres
10
Parcel #
1020-381-01
State Highways
SR-83, 60
Schools
ES and JH
Waterways
Cypress Channel
Township
2S
Range
9W
Section
12

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print