Project Info

Title
Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project
Description
The Project entails activities to increase storm water conveyance capacity in a drainage ditch originating at the terminus of a storm drain. Project activities include, excavating accumulated sediment and vegetation from the storm water drainage ditch and detention basin, widening the drainage ditch, creating a berm and new pedestrian path with the excavated spoils, installing new culverts under the existing footpath and new footpath, installing a pre-cast concrete outfall structure and repairing the undercutting and associated structural damage to the O'Conner Pump Station outfall structure. CDFW is executing a Lake and Streambed Alteration Agreement, Number 1600-2012-0235-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, City of East Palo Alto.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
City of East Palo Alto Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project
City of East Palo Alto Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project
City of East Palo Alto Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project