Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project

3 Documents in Project

Summary

SCH Number
2013032065
Lead Agency
East Palo Alto, City of (City of East Palo Alto)
Document Title
Runnymede Storm Drain Project Phase II and Repair of the O'Connor Pump Station Outfall Structure Project
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2014
Present Land Use
Municipal (Utility) / Resource Management (RM)

Document Description
The Project entails activities to increase storm water conveyance capacity in a drainage ditch originating at the terminus of a storm drain. Project activities include, excavating accumulated sediment and vegetation from the storm water drainage ditch and detention basin, widening the drainage ditch, creating a berm and new pedestrian path with the excavated spoils, installing new culverts under the existing footpath and new footpath, installing a pre-cast concrete outfall structure and repairing the undercutting and associated structural damage to the O'Conner Pump Station outfall structure. CDFW is executing a Lake and Streambed Alteration Agreement, Number 1600-2012-0235-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, City of East Palo Alto.

Contact Information
Suzanne DeLeon
CDFW, Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

Phone : (831) 440-9433

Location

Coordinates
37°27'50.3"N 122°7'31.6"W
Cities
East Palo Alto
Counties
San Mateo
Cross Streets
Runnymede Street south to O'Connor Street
Zip
94010
Total Acres
21
Parcel #
063580-100, -400, -0050; see PD
State Highways
Hwy 101
Airports
Palo Alto County
Schools
Ronald McNair, EPA Crt.
Waterways
San Francisquito Creek, San Francisco Bay
Township
5S
Range
2W
Other Location Info
Weeks and Gardens

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
1960 Tate Street, East Palo Alto, Ca 94303

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search