SCH Number 2013012023


Project Info

Title
Wisconsin Avenue Pump Station
Description
The project would demolish the existing pump station and remove portions of storm drain pipelines entering the existing station, as well as remove existing discharge pipelines from the station to a backwater slough of the Calaveras River. A new pump station would be constructed on the existing station site. The new station would include three main pumps and one smaller "low flow" pumps. Each pump would have an attached discharge pipeline that would go over an existing levee to a concrete dissipater box to be constructed in the backwater slough. Two new sections of storm drain pipelines, along with new manholes, would be installed. New chain link fencing would surround the new station, with a chain link double gate allowing entry.
Download CSV New Search

 

2 documents in project

Type Lead Agency Received Title
Reclamation District 1614 Wisconsin Avenue Pump Station
Reclamation District 1614 Wisconsin Avenue Pump Station

Disclaimer: Summaries of the notices may take several days to appear on CEQAnet. Again, the publishing of information on CEQAnet does not factor into when such notices were received and posted by the SCH. Contact the SCH for copies of an NOE or NOD that has been posted at OPR.