Permit No. 19451: Reclamation District No. 1614 - Smith Tract - Wisconsin Avenue Pump Station Project

4 Documents in Project

Summary

SCH Number
2013012023
Lead Agency
Reclamation District 1614
Document Title
Permit No. 19451: Reclamation District No. 1614 - Smith Tract - Wisconsin Avenue Pump Station Project
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2020
Document Description
Approval of Permit No. 19451, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To upgrade the Wisconsin Avenue Pump Station, the project will include: the removal and replacement of an existing 20-inch and 18-inch diameter discharge pipes; the installation of two (2) new pumps with 24-inch diameter pipes; and the construction of a new discharge outfall structure, with rock slope protection, on the waterside levee shoulder.

Contact Information

Name
Itzia Rivera
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Name
Agency Name
Reclamation District No. 1614 - Smith Tract
Contact Types
Project Applicant

Location

Cities
Stockton
Counties
San Joaquin
Other Location Info
The project is located on the left (south) bank of the Calaveras River, approximately 4100-feet downstream of Interstate 5 in the City of Stockton, San Joaquin County.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print