SCH Number 2012111079


Project Info

Title
PG&E Topock Compressor Station Soil Investigation Project EIR
Description
The project involves soil investigation activities within the PG&E Compressor Station (Station) fence line and surrounding vicinity, which has been affected by historical releases of hexavalent chromium and other chemicals of concern. Soil investigation activities include soil sampling and analysis as described in the Soil Resource Conservation Recovery Act (RCRA) Facility Investigation/Remedial Investigation (RFI/RI) Work Plan (known as the Soil Work Plan). Following soil sampling and analysis, bench scale tests, pilot studies, and geotechnical evaluations may be undertaken to support a future Soil Corrective Measures Study/Feasibility Study (Soil CMS/FS) and potential plant or other biota sampling activities may be undertaken to support a future ecological risk assessment. The Soil Investigation Project is required to determine the nature and extent of soil contamination at the Station and surrounding area.
Download CSV New Search

 

6 documents in project

Type Lead/Public Agency Received Title
Department of Toxic Substances Control PG&E Topock Compressor Station Soil Investigation Project EIR
Department of Toxic Substances Control PG&E Topock Compressor Station Soil Investigation Project EIR
Department of Toxic Substances Control PG&E Topock Compressor Station Soil Investigation Project EIR
Department of Toxic Substances Control PG&E Topock Compressor Station Soil Investigation Project EIR
Department of Toxic Substances Control PG&E Topock Compressor Station Soil Investigation Project EIR
Department of Toxic Substances Control PG&E Topock Compressor Station Soil Investigation Project EIR