PG&E Topock Compressor Station Soil Investigation Project EIR

6 Documents in Project

Summary

SCH Number
2012111079
Lead Agency
Toxic Substances Control, Department of (Department of Toxic Substances Control)
Document Title
PG&E Topock Compressor Station Soil Investigation Project EIR
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2015
Present Land Use
Institutional/Open Space/Recreational

Document Description
The project involves soil investigation activities within the PG&E Compressor Station (Station) fence line and surrounding vicinity, which has been affected by historical releases of hexavalent chromium and other chemicals of concern. Soil investigation activities include soil sampling and analysis as described in the Soil Resource Conservation Recovery Act (RCRA) Facility Investigation/Remedial Investigation (RFI/RI) Work Plan (known as the Soil Work Plan). Following soil sampling and analysis, bench scale tests, pilot studies, and geotechnical evaluations may be undertaken to support a future Soil Corrective Measures Study/Feasibility Study (Soil CMS/FS) and potential plant or other biota sampling activities may be undertaken to support a future ecological risk assessment. The Soil Investigation Project is required to determine the nature and extent of soil contamination at the Station and surrounding area.

Contact Information
Aaron Yue
Department of Toxic Substances Control
5796 Corporate Avenue
Cypress, CA 90630

Phone : (714) 484-5439

Location

Coordinates
34°43'15"N 114°29'45"W
Cities
Needles
Counties
San Bernardino
Cross Streets
National Trails Highway
Zip
86436
Total Acres
780
Parcel #
Various
State Highways
SR 66/I-40
Railways
BNSF
Waterways
Colorado River
Township
7N
Range
24E
Section
5,6,
Base
MDB&M
Other Location Info
Topock, AZ Golden Shores
Other Information
Cont.: Sections: 8,9

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
DTSC, 5760 Corporate Ave, Cyrpess, CA 90630

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search