PG&E Topock Compressor Station Soil Investigation Project EIR

6 Documents in Project

Summary

SCH Number
2012111079
Lead Agency
Department of Toxic Substances Control
Document Title
PG&E Topock Compressor Station Soil Investigation Project EIR
Document Type
NOD - Notice of Determination
Received
Posted
8/24/2015
Present Land Use
Institutional/Open Space/Recreational
Document Description
The project involves soil investigation activities within the PG&E Compressor Station (Station) fence line and surrounding vicinity, which has been affected by historical releases of hexavalent chromium and other chemicals of concern. Soil investigation activities include soil sampling and analysis as described in the Soil Resource Conservation Recovery Act (RCRA) Facility Investigation/Remedial Investigation (RFI/RI) Work Plan (known as the Soil Work Plan). Following soil sampling and analysis, bench scale tests, pilot studies, and geotechnical evaluations may be undertaken to support a future Soil Corrective Measures Study/Feasibility Study (Soil CMS/FS) and potential plant or other biota sampling activities may be undertaken to support a future ecological risk assessment. The Soil Investigation Project is required to determine the nature and extent of soil contamination at the Station and surrounding area.

Contact Information

Name
Aaron Yue
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Needles
Counties
San Bernardino
Cross Streets
National Trails Highway
Zip
86436
Total Acres
780
Parcel #
Various
State Highways
SR 66/I-40
Railways
BNSF
Waterways
Colorado River
Township
7N
Range
24E
Section
5,6,
Base
MDB&M
Other Location Info
Topock, AZ Golden Shores
Other Information
Cont.: Sections: 8,9

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print