SCH Number 2012111028


Project Info

Title
Garfield Reservoir Replacement Project
Description
The City of South Pasadena (City) proposes the construction of a replacement for the Garfield Reservoir. The Garfield Reservoir is a 6.25-million-gallon (MG) reservoir, constructed of concrete and covered by a metal roof supported on a wood frame. A replacement reservoir is needed to bring the Garfield Reservoir up to current seismic standards. The proposed project includes demolition of the existing Garfield Reservoir and pump station and construction of two replacement reservoirs, a pump station, inlet/outlet vault, rechlorination room, and a Water Distribution support yard on the project site. The proposed project also includes the replacement of a storm drain within an existing easement through the adjacent Blair High School athletic field. Construction of the proposed project is expected to begin in fall 2013 and is expected to last for 18 months.
Download CSV New Search

 

2 documents in project

Type Lead/Public Agency Received Title
City of South Pasadena Garfield Reservoir Replacement Project
City of South Pasadena Garfield Reservoir Replacement Project